Timmerfabriek
Cultural cluster Maastricht
Client
Municipality of Maastricht
Design2010-2013
Our design involves the redevelopment of the building Sphinx as well as the construction of a new building with a flexible theater. In 2013, the development of the cultural cluster is cancelled due to a major cut on cultural subsidies
NEXT
Client
Municipality of Maastricht
Design2010-2013
Our design involves the redevelopment of the building Sphinx as well as the construction of a new building with a flexible theater. In 2013, the development of the cultural cluster is cancelled due to a major cut on cultural subsidies
NEXT